Day to day things don't seem to move that quickly, but at the end of the week we are sometimes surprised all that has happened. Within the last week, the siding has finished on the West side, gutters are up and connected to the drain tile, ductwork is complete, electrical wiring is almost complete, and the chimney is completed from the basement through the roof.
On Saturday, our friends Aron and Myra came to help prepare for the roof insulators. We (mostly they) stuffed fiberglass insulation in the space between the top of the wall and the roof sheathing. This way when the expanding foam is sprayed on the bottom side of the roof, it won't blow all over everywhere.
The inside will really start to take shape next Monday when the drywall is hung.