Thursday, September 3, 2009

Labor Day - Retaining Wall

Well, a lot has happened since the last posting. The interior framing is down to a few details remaining. The last exterior hole - a door - will be put in tomorrow. The plumbing is all roughed in. The ductwork is nearly completed. The power line has been run to the meter socket and turned on - we have 4 outlets that are hot! The phone line is run to the house, causing an immediate temporary outage of the power. The geothermal wells have been dug and connected to the house. The window wells have been put in and backfilled. And as the photos below show, the siding has started!

The retaining wall block has been delivered. In celebration of Labor Day, we will be laboring to put it in for the sunken patio on the West side of the house, away from the road.

No comments:

Post a Comment