Sunday, November 15, 2009

Garage, etc.

After a week of prep work, we poured the garage floor on Saturday morning. Most of the work was hired, but I helped some.

Then, one of my cousins came with help this morning to start framing the walls. All 4 walls are up, and 2 are sheeted.

Michele and I have been working on the tile for the North entryway. The backerboard is down and almost all of the tile cuts have been made. We should set it tomorrow night.

Quite a bit of backfill has happened, and a lot of topsoil has been spread in place. Those pictures are hard to show anything.




No comments: